Sunday, April 21, 2013

Assembly

04/20/2013

I am very impressed with the kit that Nop Head prepared.
Clear instructions, Very well packaged and everything's clearly labeled

Small Parts Lables
X Idler Assembly
04/21/2013
X Motor Assembly
In the instructions, each sub-assembly is in a separate section. it starts out with a parts list of required Vitamins, Goodies and Printed parts.  I start each sub-assembly by counting  out the parts needed for that section, and putting the small parts in a Chinese carryout tray.

Parts layed out for X Motor Assembly
X Motor Assembly
X Motor Assembly

Z Motor Assembly
Parts for Z Motor assembly

Closeup - Z Motor Assembly Parts

Closeup - Z Motor Assembly Parts

 Z Axis Assembly

Parts for Z Axis assembly includes previous sub-assemblies

Left Side Z Axis Assembly

Right Side Z Axis Assembly

Y Idler Assembly


Y Motor Assembly
 Nop Head has designed a really nice wire handling system by using ribbon cables for the flexible bridged

Soldered up the ribbon cable to the Hot Bed and thermister

Completed Y Carriage Assembly

Completed Y Carriage Assembly




No comments:

Post a Comment